Filed my PFL bonding claim in SDI Online about five days ago for our second kid, born last month. Someone at work told me there's a 14 day waiting period before EDD pays anything. I thought that was only for disability, not PFL. Now I'm second-guessing myself and I can't find a clear answer anywhere. Can someone set me straight? Is there actually a 14 day waiting period for PFL bonding or not?

Two days I spent combing SDI Online wondering the same thing after my intermittent bonding days weren't showing as paid. My schedule had changed and I wasn't sure if the DE 2580GF had been received. I ended up reaching an EDD agent through Claimyr (claimyr.com). Video on reaching a live person at EDD Paid Family Leave: https://youtu.be/DOLxZQb92wM. The agent pulled up my claim and confirmed the DE 2580GF was in the system and that my intermittent days were queued correctly. No 14-day wait on PFL by the way. That's a disability thing. PFL starts paying from day one of your leave once EDD clears the claim.

0 coins

I've used Claimyr too and the payment method piece was what I needed sorted out. The agent confirmed my direct deposit info had been received and was set for the next payment cycle. EDD took a bit to issue the first one but zero waiting period involved.

0 coins

I tried that line six mornings in a row before giving up. How long did you actually stay on hold before anyone picked up?

0 coins

Claimyr just parks itself on hold for you and your phone rings when an EDD agent is there. I didn't sit on the line at all.

0 coins

Huh. Might be worth trying, I've got a question about my own claim anyway.

0 coins

You are correct that PFL has no waiting period. The seven unpaid days at the start apply to Disability Insurance, which covers a worker's own illness or pregnancy, not to Paid Family Leave. Your bonding claim should be paid from the first day of leave once EDD determines eligibility, and that decision can take up to 14 days. It sounds like your coworker may have mixed up the two programs.

0 coins

Mei Lin

Author

So the 14 days is how long EDD takes to decide, not days I sit unpaid first. That makes way more sense. Thank you.

0 coins

Wait, so if EDD takes up to 14 days to decide and my claim is on day 11, should I be worried? I haven't gotten a Notice of Computation yet and I don't know if that's normal.

0 coins

At day 11 you are still within that window. The Notice of Computation shows your potential weekly benefit amount and comes separately from an eligibility decision. If day 14 passes with no movement, send a Request Claim Update through SDI Online.

0 coins

Okay, sending that update now. I had no idea the notice and the approval were two separate things.

0 coins

The 14-day thing gets EVERYONE. I told three people at my depot that PFL has no waiting period and they all looked at me like I was making it up. EDD's own site says it plainly but nobody reads it until they're already panicking.

0 coins

edd could really just put a big banner on the claims page that says no waiting period and save everyone the stress

0 coins

You'd think. Instead they bury it in a FAQ nobody finds until they're on page four of their browser history at 11pm.

0 coins

The confusion makes sense because disability and PFL share the SDI system. When you file through SDI Online it all looks the same. But the rules are different. No waiting period for PFL, full stop. Disability has the seven-day unpaid period, PFL doesn't. EDD's Paid Family Leave guide (DE 2530) spells it out if you want to see it in writing.

0 coins

I think I made this mistake too. I kept expecting to lose my first week and I actually started leave later than I needed to because of it. Really wish I'd known before.

0 coins

That's the part that stings. If you delayed your leave start by a week thinking you'd lose it anyway, that's a week of benefits you may not be able to recover. Worth asking EDD if the original start date can still be used while you're within the 41-day filing window.

0 coins

My 41 days aren't up yet, I think. I'll check the date and ask EDD about it.

0 coins

No waiting period for PFL. Benefits run from day one of leave. The 14 days people hear about is EDD's review window to decide the claim, not unpaid days you absorb.

0 coins

Glad someone said it plainly. I read three forums before I found this.

0 coins

Easy to get lost in it. The SDI system covers two different programs and the rules don't line up.

0 coins

My partner had this exact question when she went on bonding leave in the spring. HR at her job had told her to expect a two-week gap in pay at the start, so she was budgeting for it. Turns out HR was confusing their own short-term disability policy with PFL. No gap, first payment came through fine.

0 coins

Mei Lin

Author

HR getting it wrong is kind of alarming honestly. That's who most people ask first.

0 coins

Right?? They probably deal with more disability claims than PFL so the waiting period sticks in their head. For PFL it just doesn't apply, lol.

0 coins

I had an HR rep tell me I'd need to serve seven unpaid days on my bonding claim too. I had to show her the EDD page before she believed me. Definitely double-check anything HR tells you about PFL specifics.

0 coins

After my bonding leave ended I got a DE 2514 in the mail and genuinely panicked. I had no idea what it meant. I ended up talking to an EDD agent through Claimyr. The agent looked up my claim and explained exactly what the determination said and that I had 30 days to file an appeal if I disagreed. That notice does not mean denied automatically, it just means EDD made a decision and you need to read what it says.

0 coins

I find it hard to believe you got a live agent that fast. I spent forty minutes on that line last Thursday and got the recording that just ends the call. What time did you phone?

0 coins

I didn't sit on hold myself. Claimyr holds the line for you and your phone rings once an agent is there. I tried the line direct for two days before that and got nowhere.

0 coins

I've used Claimyr for my own claim too. When I finally reached an agent I asked about my receipt number and whether EDD had matched it to my Part D. The agent confirmed the receipt number was in the system and Part D was showing as received. That was the only thing holding my care claim in pending.

0 coins

Okay, that receipt number piece is exactly what I need to know about. I'll try it.

0 coins

DE 2514 showing up after a bonding claim confused me too. Read every word of it before doing anything else.

0 coins

No waiting period. File, EDD reviews up to 14 days, they decide, money moves. Straightforward once you know.

0 coins

wish someone had told me that before i stressed for two weeks thinking i owed edd a week of pay back

0 coins

Lot of people assume the worst. It's not as bad as it looks most of the time.

0 coins

Can I ask about timing on the first payment? My claim got approved but I haven't seen money yet. The Notice of Computation came and I know what my weekly amount is, but I don't know if I should be waiting another week or if something is wrong.

0 coins

The Notice of Computation and actual payment are separate steps. After EDD approves you, the first payment information comes in an Electronic Benefit Payment Notification, the DE 2500E. Most payments go out within two weeks of EDD receiving a complete claim. If it's been longer than that since your approval, a Request Claim Update in SDI Online is a good next step.

0 coins

I didn't know there was a DE 2500E coming too. I thought the Notice of Computation was the payment notice. This whole process has way more steps than I expected.

0 coins

The notices stack up fast. Notice of Computation first, then DE 2500E once payment is on its way. It's a lot to track when you're also taking care of a newborn.

0 coins

Exactly. I keep opening my mailbox expecting a check and getting more forms instead.

0 coins

my coworker told me the same thing about a waiting period and i almost delayed my claim start by a whole week because of it. so glad i looked it up first

0 coins

Mei Lin

Author

Same situation basically. Everyone seems to get this wrong. It really is just the disability program that has the waiting period, not PFL at all.

0 coins

yeah edd should really separate these two things more visually on their site

0 coins

For anyone who filed a bonding claim as the father or non-birth parent, the proof of relationship document is a separate thing from the waiting period question. The birth certificate or Declaration of Paternity gets uploaded in SDI Online. That's what can slow a bonding claim down if it's missing, not a mandatory waiting period.

0 coins

Mei Lin

Author

I uploaded the birth certificate the day I filed. Good to know that's the right move.

0 coins

Yes, uploading it right away avoids the most common hold on a bonding claim for non-birth parents. EDD still needs up to 14 days to review, but at least the document piece is done.

0 coins

I didn't know I needed to upload anything. I just submitted the online form and assumed that was it. Now I'm worried my claim is sitting there waiting for a document I didn't send.

0 coins

Log into SDI Online and check your claim status. If EDD is waiting on proof of relationship it should show that or you'll see it in a notice. If you haven't gotten a request yet you may still be in the review window.

0 coins

The day my bonding leave started the status still said pending, and nothing about proof of relationship had shown up in SDI Online. I used Claimyr to reach an EDD agent and ask what document EDD was actually waiting for. The agent told me my birth certificate upload had come through but was not yet matched to the claim, and that once it matched the pending status would clear. At least I knew it wasn't lost.

0 coins

What is Claimyr exactly? I keep seeing it mentioned but I don't know what it does.

0 coins

It just waits on hold with EDD's Paid Family Leave line for you, so your phone rings when a real agent picks up. I'd tried the line direct three mornings and got nowhere.

0 coins

That would actually help me. I want to ask EDD whether my claim's start date was recorded correctly since I may have put the wrong date in SDI Online.

0 coins

The birth certificate matching thing happened to me too. Took a few days after upload before it connected to the claim.

0 coins

EDD takes up to 14 days to process. That's review time, not a waiting period. Two different things. The confusion makes sense but they are not the same.

0 coins

You'd be amazed how many people don't know this. I've seen coworkers hold off starting leave because they thought the first week would be unpaid. EDD loses nothing by being clearer about it.

0 coins

Agreed. One line on the confirmation page would fix most of this.

0 coins

The benefit calculator on EDD's site gave me a rough number before my Notice of Computation arrived and it was pretty close to what the actual notice said. If you're trying to budget while you wait, that's a decent tool to use.

0 coins

Where do I find that? I've been trying to figure out what my payments will be before they start.

0 coins

Go to edd.ca.gov and look for the PFL calculator. You put in your wages from the base period and it estimates your weekly amount. The notice will confirm the real figure.

0 coins

Mei Lin

Author

I used that too. It was within a few dollars of my actual weekly amount on the notice, which helped me figure out if we could swing things financially while I was out.

0 coins

October 3rd my care claim went to pending, and by October 17th I still had no Notice of Computation and Part D hadn't been confirmed as received. I was watching the 41-day deadline get closer and not knowing if my doctor had submitted the form in time.

0 coins

For a care claim, the Part D must reach EDD within 41 days of when your leave started. If your doctor submitted it in SDI Online with your receipt number, it should show there. If they mailed it, you can send a Request Claim Update to ask if it was received.

0 coins

I gave the office my receipt number and they said they submitted it online. I'll check SDI Online again today to see if the status changed.

0 coins

The doctor submitting it online with the receipt number is the fastest way. If they mailed it and it's close to 41 days, it's worth following up with the office to confirm they sent it.

0 coins

spent three mornings hitting redial before i gave up and just sent a request claim update through sdi online. got a response in a few days. sometimes that's just the easier path

0 coins

The online update request is underrated. I went straight to it on day 10 when my claim was still showing pending and got an answer without ever reaching a live person.

0 coins

yeah once i figured out where it was in sdi online i stopped dreading the phone entirely

0 coins

The 41-day deadline to file is a separate thing from EDD's 14-day review window. The 41 days runs from the first day of your leave. File late and you can lose benefits for the days before you filed. EDD's guide, the DE 2530, lays this out clearly.

0 coins

wait so the 41 days is from when you START leave not when the baby is born? i thought it was from the birth date

0 coins

The 12-month window to use bonding benefits runs from the birth or placement date. The 41-day filing deadline runs from when your leave actually started. If your leave started the same day as the birth, they're the same day. If you went back to work first and started leave later, it's the leave start date that matters.

0 coins

ok that actually clears it up. i started leave the day after the birth so its basically the same thing for me

0 coins

Disability has a seven-day unpaid period. PFL doesn't. If someone tells you otherwise, they're thinking of the wrong program. Happens constantly.

0 coins

My HR said the same thing and I had to send her the EDD FAQ link before she updated her notes. That misinformation costs people money if they delay their leave start.

0 coins

Costs them bonding time too. Starting a week late thinking it's unpaid and then finding out it wasn't is a rough feeling.

0 coins

Mei Lin

Author

Day 12 on my claim now. No Notice of Computation yet but no denial either. Going to send the Request Claim Update today since we're at the edge of that 14-day window. Thanks everyone, this thread answered every question I had about the waiting period thing.

0 coins

Day 12 isn't past the window yet but it's close enough that the update request makes sense. Good call.

0 coins

If EDD needs anything else from you, sending that update often surfaces it faster than waiting for a notice. Keep an eye on your SDI Online messages.

0 coins

Mei Lin

Author

Logged in and sent it. Status still says pending but at least I know that's normal and not some hidden waiting period eating my benefits.

0 coins

Eight weeks total between bonding and care combined, not eight each. Someone at my job thought he had sixteen weeks available across both. Worth knowing before you plan anything.

0 coins

Eight weeks total, not eight per claim type, is something I had completely wrong before this. I thought bonding and care each had their own pool of eight.

0 coins

A lot of people get that wrong. If you use five bonding with the new baby, you've got three left in those twelve months for a care claim if something comes up.

0 coins

I had no idea about that limit either. I was planning to use all eight bonding weeks and then assumed I'd have eight more if my mom needed care later in the year.

0 coins

The eight weeks is the total for all PFL claim types combined within any 12-month period. It's one pool shared across bonding, care and military assist, so planning ahead matters if you think you might need both.

0 coins

California Paid Family Leave AI

Expert Assistant
Secure